Our Services

Micro tunneling Qatar – DDC
01

Micro Tunneling

DDC is a pioneer in Micro Tunneling across the GCC. Our pipe jacking machines range from 400 mm to 3000 mm diameter, covering sewerage, drainage, treatment plants and outfall systems throughout Qatar.

We deploy advanced AVN, RCM and MTS Tunnel Boring Machines capable of working in diverse ground conditions including rock, sand and mixed-face.

Pipe Jacking 400–3000mmFoam GroutingAnnular GroutingDuctile Iron InstallGRP PipesRCJP Pipes
Request a Quote
Civil construction Qatar – DDC
02

Civil Construction

Our civil construction division handles the full spectrum of infrastructure works including roads, drainage systems, pumping stations and treatment plants across Qatar.

From large-scale government infrastructure to private sector development, DDC delivers high-quality earthworks, pavement and utility installations on time.

Excavation & EarthworksRoad ConstructionPumping StationsTreatment PlantsMEP Works
Request a Quote
Grouting services Qatar – DDC
03

Grouting Services

Foam and annular grouting solutions ensuring secure pipe installation and long-term structural integrity. Grouting fills the annular space between pipe and soil, reducing ground movement and protecting pipelines.

Foam GroutingAnnular GroutingVoid FillingSoil Stabilisation
Request a Quote
Shaft excavation and design Qatar – DDC
04

Shaft Excavation & Design

DDC has delivered complex launching and receiving shafts across Qatar. On the Um Alhoul SEZ project alone, DDC executed 71 shafts (8mx6mx10m), totalling 1145 metres depth.

Launch & Reception ShaftsShaft DesignSheet PilingDewatering
Request a Quote
Equipment rental & energy services Qatar – DDC
05

Energy Services & Equipment Rental

Electrical, Water and Sewage Pipe Laying, Supply and Services alongside Heavy Equipment and Car Rental. Our fleet includes excavators, cranes (35–150 ton), gantry cranes, trucks and specialised tunneling machinery.

Electrical ServicesPipe Laying & SupplyHeavy Equipment RentalManpower Supply
Request a Quote

Equipment List

TBM Machines (Dia mm)
AVN 6001
RCM 8005
RCM 10002
AVN 12001
AVN 14001
AVN 16002
MTS 18002
MTS 20002
MTS 24006
AVN 30003
Heavy Vehicles
Excavator8
Crane 100/35/150t12
Gantry Crane6
Trucks10
Water Tanker15
40" Trailer8
Heavy Equipment
Wood Concrete Shutter20
Steel Concrete Shutter15
Plate Compactors5
Concrete Vibrator5
Roller Compactors36
Power Plants & Other
Generator – Small15
Generator – Big26
Welding Machine20
Pulling Machine6
Mobile Store30
Water Pump25

Our Process

01

Consultation

Project review, site investigation and requirements analysis.

02

Design & Planning

Engineering design, shaft layout, machine selection and scheduling.

03

Mobilisation

Equipment deployment, shaft excavation and TBM launch preparation.

04

Execution

Precise tunneling, pipe installation, grouting and real-time monitoring.

05

Handover

Testing, inspection, documentation and project handover to client.